corrvin: "this space intentionally not left blank" (Default)
I survived whatever intestinal nightmare I had two days ago, with the addition of the cramps I got last night, and now that I can sit up without pain, I feel pretty good.

Take 2 on the sweater proceeds slowly but surely. I'm about 2" up from the ribbing and it's all fast knitting until the short rows. If I try to work hard on it this weekend, then... uh, then something else really important will come up and nothing will get done.

I probably won't have this done before vacation, anyways. But that's ok. Weather forecast is promising us some lows of 58 next week, but as it's while I'm at work, I'll never get to enjoy it.

Status reports:
Shamanlevel 34
Magelevel 9
Sweater10/77 rows on body
Bedroom wallsDone
Bedroom floor2/3, Raven working on it
Reading roomSort of clean, still needs paint
Vacation10 work days to go

Profile

corrvin: "this space intentionally not left blank" (Default)
Corrvin

March 2026

S M T W T F S
1234567
891011121314
15161718192021
22232425262728
293031    

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 24th, 2026 08:07 am
Powered by Dreamwidth Studios